The Dellepiane Highway will be closed for three days due to works: when will it be closed

It started this week Huge operation on the Dellepiane highway To assemble the three beams that will form the structure of the Pedra Buena pedestrian bridge. As shown in LN+, Lanes on both sides will remain closed crossing For three days.

They reported from the Buenos Aires government that more than 50 people worked on Wednesday for Assembling a beam 13 meters long, 4.5 meters wide and weighing 80 tons. “To do this, it required two cranes with a capacity of 300 tons in coordinated work on the poles that were installed on the sides of the road,” they explained.

They will block the Buenos Aires Expressway for three nights to build a new bridge
They will block the Buenos Aires Expressway for three nights to build a new bridge

Delibian Highway It will be closed to vehicular traffic on Wednesday and Thursday In both directions between Larrazabal and General Paz, From 10 pm for seven hours.

They stated in a statement, “Tonight and tomorrow evening, this process will be repeated to assemble the other girders, 21 meters long, 4.5 meters wide, and weighing 112 tons, which will complete the bridge structure.”

African Union. Delibian: They assembled the first pillar of the new bridge
African Union. Delibian: They assembled the first pillar of the new bridge

While cutting, Traffic traveling along the Riccheri Highway towards the center will be diverted to General Paz Street, where you can take different alternative routes. How to connect to Perito Moreno Highway or use Directio Street – San Juan Avenue; Roca Street or 27 de Febrero Street.

In the opposite direction, Towards the province, traffic passing through the Dellepiane Highway must exit from Larrazábal From there, you can continue on General Paz Avenue through the complex, or use the Eva Perón or Alberdi roads. They can also turn early, via the Perito Moreno Expressway, to connect to General Paz – Richeri Street.